Welcome to the MEI Plan Room

If there is any problem with this site, please contact Matt Clarke by email or by telephone at 812-295-2800.

Bids & Spec Sheets

Project Date:06/22/2010
Date Due:07/13/2010
Company:Decatur County Rural Water Corp.
Bid Notice:Notice to Bidders.pdf
Project Description:
The project consists of:
- Installation of approximately 2.2 miles of 6” diameter water main
- Installation of approximately 1.8 miles of 8” diameter water main
- Installation of approximately 12 service meters and corresponding service line
- Installation of two (2) master meter pits
- All other necessary appurtenances
Project Date:07/09/2010
Date Due:08/04/2010
Company:Patoka Lake Regional Water & Sewer District
Bid Notice:Notice to Bidders.pdf
Project Description:
The project consists of:
- Installation of approximately 7.6 miles of 16” thru 30” diameter ductile iron water main
- Connections to Existing Mains
- Renovations/Improvements to an Existing Master Meter Pit
- All other necessary appurtenances
Project Date:07/19/2010
Date Due:08/16/2010
Company:Pike-Gibson Water Corporation
Bid Notice:Notice To Bidders.pdf
Project Description:
The project consists of:
- 8,370, L.F. of 3” and 6” PVC SDR 21 Watermain
- 1,500 L.F. of open cut and bored encased watermain and other related appurtenances.
Project Date:08/09/2010
Date Due:08/25/2010
Company:City of Salem
Bid Notice:Notice to Bidders.pdf
Project Description:
The project consists of:
- 2,700 L.F. of 24” D.I. Class 250 pipe and associated appurtenances.
Project Date:08/12/2010
Date Due:09/08/2010
Company:Daviess County Rural Water
Bid Notice:Notice to Bidders.pdf
Project Description:
The project consists of:
- 2,900, L.F. of 4”and 6” PVC SDR 21 Watermain
- 1,630 L.F. of open cut steel encased watermain and other related appurtenances.
Project Date:08/24/2010
Date Due:09/14/2010
Company:Decatur County Rural Water Corp.
Bid Notice:Notice to Bidders.pdf
Project Description:
Division II – 500,000 Gallon Elevated Water Storage Tank (Tank No. 2)
- Installation of a 500,000 gallon multi legged steel elevated water storage tank
- An alternate bid will be taken for installation of a 500,000 gallon spheroid elevated water storage tank
Project Date:08/24/2010
Date Due:09/14/2010
Company:Decatur County Rural Water Corp.
Bid Notice:Notice to Bidders.pdf
Project Description:
Division III – Transmission/Distribution System Improvements
- Installation of approximately 1.8 miles of 16” diameter water main
- Installation of approximately 5.8 miles of 12” diameter water main
- Installation of a solenoid valve and pit
- All other necessary appurtenances
Project Date:08/25/2010
Date Due:09/14/2010
Company:Decatur County Rural Water Corp.
Bid Notice:Notice to Bidders.pdf
Project Description:
Division I Booster Station No. 2
- Installation of a booster station and master meter pit including two (2) cased highway bores and electrical and controls
Project Date:09/03/2010
Date Due:10/04/2010
Company:Posey Township Water Corporation
Bid Notice:Notice to Bidders.pdf
Project Description:
The project consists of: 10,700 L.F. of 10” Pipe, 8,100 L.F. of 8” Pipe, Control Valve and Meter Pit, Booster Station and associated appurtenances. A prebid conference will be held on Thursday, September 23, 2010 at 9:00 A.M. (Local Time) at the Posey Township Water Corporation Office located at 136 East U.S. Hwy. 150, Hardinsburg, Indiana. Anyone considering bidding on this project is encouraged to attend.