Job Company Description Bid Date
MEI Project #200802 Patoka Lake Regional Water & Sewer District - Extending a 36” steel casing - - Installing a section of 20” D.I. CL-250 Restrained Joint Pipe - - Installing a 20” Butterfly Valve - - Any necessary bank stabilization and traffic control during the project Oct 29, 2008
MEI Project #200852 West Gate and Crane Tech Park Construction of approximately 1,700 L.F. of 8” water mains, hydrants, valves and all other necessary appurtenances and approximately 1,720 L.F. of 8” gravity sewer mains, manholes and all other necessary appurtenances. Oct 30, 2008
MEI Project #200857 Shoals Community School Corporation The project consists of construction of home and visitor’s dugouts, player’s benches and storage units, and related work to existing chain-link fence. Nov 13, 2008
MEI Project #200857 (Classroom) Shoals Community School Corporation Removal of Existing Accordion Partitions and Construction of New Steel Frame and Gypsum Board Partitions. Nov 13, 2008
MEI Project #99049-17 Pike-Gibson Water, Inc. Repainting 161,000 Gallon Standpipe, work to be done by end of May, 2009 Nov 17, 2008
MEI Project #200539 City of Petersburg Sanitary Sewer System Improvements Division I – Collection System Improvements The project consists of manhole rehabilitation, sixteen (16) 8” point repairs, 2,360 L.F. of cured in place liner, 160 L.F. of 18” cured in place liner and cleaning and televising 5,500 L.F. of 18”, 12” and 8” sewer mains. Nov 17, 2008
MEI Project #200807 Santa Claus Waterworks, Spencer Co., IN Relocating 13,000 feet of 4” water main, 700 feet of cased and uncased directional borings, 2,350 feet of 3/4” directional borings, dry tap connections and miscellaneous appurtenances. Dec 9, 2008
MEI Project #200836 Decatur County Commissioners Base Bid Installation of two (2) – 425 L.F. long by 30” diameter welded steel casings. - Mandatory Alternate “A” Bid Installation of one (1) additional – 425 L.F. long by 30” diameter welded steel casing. - Mandatory Alternate “B” Bid Deduct should Owner elect to install 24” diameter casings (instead of 30” diameter casings). Dec 15, 2008